Opening hoursMon to Sat, 8am to 5pm
Head officeDar es Salaam, Tanzania

Construction Project Risks in Tanzania: 10 Problems That Affect Cost, Time and Quality

Most cost overruns and delays trace back to a short list of risks. Ten that hit Tanzanian projects hardest, with practical ways to manage each one.

Male and female engineers discussing blueprints at a construction site, promoting teamwork and planning.
Photo: Mikael Blomkvist / Pexels
Share

The construction project risks that most often affect cost, time and quality in Tanzania are: design changes during construction, inaccurate cost estimates, late payments to the contractor, shortages and price swings in materials, equipment breakdowns or shortages, heavy rain and flooding, unexpected ground conditions, delays in permits and utility connections, weak site supervision and quality control, and shortages of skilled labour or poor subcontractor performance. Studies of Tanzanian building and road projects repeatedly list these same causes. Each one can be reduced with a risk register, a complete design before tender, realistic budgets with contingency, a programme that respects the seasons, clear contracts and active management from both client and contractor.

What is construction risk management?

Risk management means identifying what could go wrong, judging how likely and how serious each risk is, and deciding in advance how to reduce, share or absorb it. The main tool is a risk register: a simple table, updated through the project, listing each risk, its owner and the plan to handle it.

RiskLikelihoodImpactOwnerResponse
Example: heavy rain delays earthworksHighMediumContractorProgramme earthworks for dry season, temporary drainage

Risks are usually handled in four ways: avoid (change the plan), reduce (lower the chance or impact), transfer (insurance, contract terms, guarantees) or accept (hold a contingency).

1. Design changes during construction

Changes to drawings after the contract is signed are among the biggest causes of overruns. They come from incomplete designs, client changes of mind, coordination errors between architect and engineers, and new requirements from authorities.

How to manage it:

  • finish design and coordinate drawings before tender
  • freeze the brief before detailed design
  • use a formal variation process with prices agreed before work
  • in design-and-build, agree the employer's requirements in detail

See avoiding cost overruns.

2. Inaccurate cost estimates

Budgets based on guesswork or old prices leave the project short of money halfway through.

How to manage it:

  • use a quantity surveyor to prepare estimates at each design stage
  • price from a full bill of quantities
  • include a contingency of 5 to 15% depending on uncertainty
  • update the estimate when design or prices change
A professional woman calculating finances at a desk with charts and a calculator.
A priced bill of quantities is the best protection against a budget built on guesswork. Photo: RDNE Stock project / Pexels

3. Late payments

Late payment to the contractor slows work, stops subcontractors and suppliers, and can lead to claims for delay and interest. It is a common problem on both public and private projects.

How to manage it:

  • secure finance before starting, or phase the project to match funds
  • agree clear payment periods in the contract
  • process valuations promptly
  • contractors should manage their own cash flow and avoid taking on more work than their finances allow

4. Material shortages and price changes

Cement, steel, bitumen, fuel and imported finishes can rise sharply or run short. Exchange rate changes affect imported items quickly.

How to manage it:

5. Equipment shortages and breakdowns

A broken excavator, roller or concrete pump can stop a site for days, especially in remote areas where spare parts are far away.

How to manage it:

6. Weather and flooding

Heavy rains, especially the long rains (masika) from about March to May, and El Niño years can halt earthworks, flood excavations and damage finished work.

How to manage it:

7. Unexpected ground conditions

Rock, soft clay, black cotton soil, high groundwater or buried services discovered after work starts can change foundations, earthworks and cost.

How to manage it:

  • commission a soil investigation before design
  • carry out a topographic and services survey
  • agree in the contract who carries the risk of unforeseen ground
Top view of construction site showing an excavator working in muddy terrain.
Rain and poor ground are two of the risks Tanzanian projects meet most often. Photo: Cầu Đường Việt Nam / Pexels

8. Permit and utility delays

Waiting for building permits, environmental approvals, TANESCO connections, water connections or road access approvals can delay a start or an opening date.

How to manage it:

9. Weak supervision and quality control

Poor workmanship that is not caught early leads to rework, defects, disputes and sometimes safety risks.

How to manage it:

  • employ qualified supervision: a consultant, clerk of works or resident engineer
  • agree an inspection and test plan
  • test concrete, steel and compaction as the work proceeds
  • see quality control and site supervision

10. Labour and subcontractor problems

Shortages of skilled workers, high turnover, and subcontractors who perform badly or leave the job all slow progress.

How to manage it:

  • contractors should keep a core skilled team and train new workers (hiring and keeping good workers)
  • vet subcontractors before appointing them
  • pay workers and subcontractors on time
  • coordinate trades through one programme

Extra risks on road and civil works projects

Road and civil projects carry the same risks as buildings, plus some of their own:

  • Material sources: a borrow pit that looked good at tender can run out or vary in quality, forcing longer hauls.
  • Land and compensation: delays in clearing the road reserve, compensating landowners or relocating structures hold up whole sections.
  • Utilities: water mains, power lines and fibre cables in the road reserve must be moved by their owners, often on their own timetable.
  • Traffic: working on a live road raises safety risk and slows production.
  • Long supply lines: remote sites wait longer for fuel, spare parts and bitumen.
  • Community relations: dust, blocked access and local hiring expectations can lead to work stoppages if not managed.

Studies of Tanzanian road projects regularly list design variations, inaccurate estimates, equipment and material shortages, weather and delayed payments as leading causes of delay and cost overrun, which matches what contractors see on site.

Other risks to keep on the register

  • health and safety incidents
  • theft and vandalism
  • disputes with neighbours over noise, dust or boundaries
  • currency changes on imported equipment
  • changes in law or taxes
  • contractor insolvency
  • loss of key staff on either the client or contractor side partway through the project

How to build a simple risk register

  1. List risks with the team at the start of the project.
  2. Score each one for likelihood and impact, for example 1 to 5.
  3. Assign an owner for each risk.
  4. Agree a response and the cost of that response.
  5. Review the register at every site meeting.
  6. Close risks that have passed and add new ones.

A one-page register reviewed monthly is better than a long document nobody reads.

Who carries which risk?

RiskUsually carried by
Design errorsClient (traditional) or contractor (design and build)
Client changesClient
Contractor's productivity, workmanship, equipmentContractor
Unforeseen groundVaries, set by contract
Exceptional weatherOften shared, time but not money for the contractor
Late paymentClient
Material price risesContractor on short fixed-price jobs, shared on long jobs with price adjustment

Read your contract carefully on these points. See our construction contract checklist.

Frequently asked questions

What is the biggest risk in construction projects in Tanzania?

Design changes and incomplete designs are among the most common causes of cost and time overruns, followed closely by late payments and inaccurate estimates.

How much contingency should a construction budget have?

Usually 5 to 10% for well-designed projects on known ground, and 10 to 15% or more where design or ground conditions are uncertain.

What is a risk register?

A table listing project risks with their likelihood, impact, owner and planned response, reviewed regularly through the project.

Who is responsible for weather delays?

The contract decides. Many standard contracts give the contractor extra time for exceptionally adverse weather, but not extra money, while normal seasonal rain is expected to be in the contractor's programme.

How can clients reduce construction risk?

Complete the design before tender, secure finance, hire a qualified contractor and supervisor, get soil and site surveys, and agree a clear contract. See 8 challenges of construction in Tanzania.

What insurance should a construction project have?

Usually contractor's all risks insurance covering the works, third-party liability for damage or injury to others, and workers' compensation for employees. Large projects may add professional indemnity for designers and cover for plant and equipment.

Should small projects have a risk register?

Yes, even a short one. A list of the five or six biggest risks, with who handles each, written down before work starts, prevents many of the arguments that follow on small jobs.

Want a project managed with risk in mind?

Vika Construction provides project management and building construction with planning, scheduling, supervision and regular reporting. Contact us to discuss your project.

Found this useful? Share it with someone who is building.

Planning a building project?

Tell us where the site is and what you want built.