Most concrete for houses in Tanzania is mixed on site, either by hand on a clean platform or in a diesel or electric drum mixer. To get strong concrete, measure cement, sand and aggregate by volume with gauge boxes or same-size buckets, mix them dry until the colour is even, add only enough clean water to make a workable mix, and place the concrete within about 30 to 60 minutes. A mixer gives more consistent concrete and is the better choice for columns, beams and slabs. Hand mixing is acceptable for small jobs like blinding, footings or small repairs. Too much water is the single most common cause of weak site concrete.
Should I mix concrete by hand or with a mixer?
| Hand mixing | Drum mixer | Ready-mix truck | |
|---|---|---|---|
| Best for | Small volumes, blinding, footings | Columns, beams, slabs on houses | Large slabs, commercial work |
| Consistency | Varies with the crew | Good if batched correctly | Best, plant-controlled |
| Output | Slow, labour heavy | About 0.1 to 0.2 m³ per batch | Several m³ per truck |
| Cost | Labour only | Mixer hire plus fuel | Higher price per m³, less labour |
For a slab, plan enough mixers and labour to cast it in one continuous pour. Stopping halfway leaves a cold joint that can leak and crack. See how to start a concrete business for mixer and ready-mix options.
How do I batch concrete by volume?
Mix ratios like 1:2:4 mean one part cement, two parts sand and four parts aggregate by volume. On site:
- Use a gauge box or the same bucket for every material. A standard 50 kg bag of cement is about 0.035 m³. A gauge box sized to one bag (for example 350 by 350 by 285 mm) makes measuring easy.
- Never use shovel counts. A shovel of sand and a shovel of aggregate are different volumes.
- Allow for wet sand. Damp sand bulks up, so a box of wet sand holds less sand. Add a little more sand or measure it drier.
- Keep materials clean. Sand with clay or silt and dirty aggregate weaken concrete. See choosing sand and aggregate.
| Mix | Typical grade | Use | Cement per m³ (approx.) |
|---|---|---|---|
| 1:3:6 | C10 | Blinding, mass fill | 4 to 4.5 bags |
| 1:2:4 | C20 | Footings, ground slabs, light work | 6.5 to 7 bags |
| 1:1.5:3 | C25 | Columns, beams, suspended slabs | 8 to 8.5 bags |
Read more in concrete grades explained and how to calculate cement, sand and aggregate.

How much water should go into concrete?
Just enough to make it workable. A rough guide is about 25 to 30 litres of water per 50 kg bag of cement for structural concrete, adjusted for how wet the sand is. Signs of too much water:
- the mix flows like soup and spreads without vibration,
- water and cement paste bleed to the surface,
- the slump test drops well beyond the target.
Each extra bucket of water can cut strength noticeably. If the mix is too stiff to place, ask the engineer about a plasticiser rather than adding water. A slump test on site keeps everyone honest.
How long should concrete be mixed?
- Mixer: about 2 minutes after all materials are in, until the colour and texture are even.
- By hand: turn the dry materials at least three times until the colour is uniform, then add water gradually and turn again three times.
Mix on a clean, hard platform or steel sheet, never on bare soil, which mixes dirt into the concrete and soaks up water.
How soon must concrete be placed?
Place and compact concrete within about 30 to 60 minutes of adding water, sooner in hot weather. Concrete that has started to stiffen should not be "re-tempered" with more water. Compact with a poker vibrator or by rodding and tapping the forms to remove air pockets, then cure it properly for at least 7 days.

What are the most common site mixing mistakes?
- Adding extra water to make placing easy.
- Measuring by shovel instead of by box or bucket.
- Dirty sand or aggregate.
- Mixing on soil.
- Long delays between mixing and placing.
- No vibration, leaving honeycombing.
- No curing after the pour.
How do I plan a concrete pour day?
A good pour depends on planning the day before, not on working harder on the day.
- Check the weather. Avoid pouring in heavy rain, and start early on hot days.
- Stock materials for the whole pour plus 10 percent: cement under cover, sand and aggregate heaped close to the mixer.
- Check water supply. A slab can need thousands of litres for mixing, cleaning and curing. Fill drums and tanks the day before.
- Test the mixer and vibrator and have fuel, spare plugs and a backup if possible.
- Assign the team: who measures, who loads, who wheels, who places, who vibrates, who finishes.
- Plan the route for wheelbarrows with boards over steel so the reinforcement is not trampled out of position.
- Prepare curing materials: sacks, plastic sheets and water ready to go on as soon as the surface allows.
How do I know the concrete is good?
On site, use the slump test for consistency and make cube samples for strength. Visually, good concrete is evenly grey, holds together without sloppy water, and leaves smooth faces with few holes when the formwork comes off. Large honeycombed areas, sand streaks or exposed steel mean the mix or the compaction was poor, and an engineer should inspect before more load goes on.
Frequently asked questions
How many bags of cement for 1:2:4 concrete?
About 6.5 to 7 bags of 50 kg per cubic metre.
Is hand-mixed concrete strong enough for a slab?
It can be, but it is hard to keep consistent over a whole slab. A mixer or ready-mix is better.
What is the right slump for slabs?
Often 75 to 100 mm for normal slabs, as the engineer specifies.
Can I use sea water for concrete?
No. Salt corrodes steel reinforcement. Use clean fresh water.