How to Lay Floor Tiles Properly: Step-by-Step Guide and Common Mistakes

Hollow-sounding, cracked and uneven tiles are some of the most common complaints in new houses. How to lay floor tiles properly, step by step.

A red tiled outdoor floor beside a flower bed in Rwanda.
Rwanda Photo: Gerard van de Bruinhorst / Wikimedia Commons, CC BY-SA 4.0
Share

To lay floor tiles properly, start with a flat, clean, cured screed, set out the room from the centre so cut tiles end up evenly at the edges, then fix the tiles with tile adhesive spread with a notched trowel so each tile is fully bedded. Use spacers for even joints, check level constantly, let the adhesive set for at least 24 hours, then grout and clean. Leave a small movement gap around the room edges, hidden under the skirting. Most problems with tiles in Tanzanian houses, like hollow sounds, cracks and lifting, come from poor bedding (dabs of mortar instead of full coverage), a weak or dirty base, or no movement joints.

What do I need to lay floor tiles?

  • Tiles, plus 10 percent extra for cutting and breakage (more for diagonal layouts).
  • Tile adhesive suitable for floors, or a cement and sand mortar bed.
  • Notched trowel (often 8 to 12 mm notch for floor tiles).
  • Spacers (2 to 5 mm), spirit level, straight edge and string line.
  • Tile cutter or angle grinder with a tile disc.
  • Rubber mallet, sponge, buckets, grout and grout float.
  • Tape measure, pencil, chalk line.

See floor finishes compared for choosing tiles, and tile prices.

Step 1: Prepare the base

The floor under the tiles must be:

  • Flat: no more than about 3 mm out under a 2 m straight edge.
  • Strong and cured: a new screed needs at least 7 to 14 days, longer if thick.
  • Clean: no dust, oil, paint or loose material.
  • Damp-proofed on ground floors.

If the base is uneven, fix it with a new screed first. See floor screeding.

Step 2: Set out the room

  1. Find the centre of the room by snapping chalk lines between the middles of opposite walls.
  2. Dry-lay a row of tiles with spacers along each line to see where the cuts land.
  3. Shift the starting point so the cut tiles at both sides are the same size and not thin slivers.
  4. In rooms you enter through a door, make sure full tiles show at the doorway.

Step 3: Spread adhesive and lay tiles

  1. Mix adhesive as the bag says, in small batches you can use within its open time.
  2. Spread it over about 1 m² with the flat side of the trowel, then comb it with the notched side in straight lines.
  3. For large tiles (60 by 60 cm and bigger), also butter the back of each tile ("back-buttering") so coverage is full.
  4. Press the tile down with a slight twist, tap with the mallet, and check it is level with its neighbours.
  5. Lift a tile now and then to check the back is fully covered. You want at least 80 to 95 percent coverage, more in wet areas.
  6. Insert spacers and keep joints straight with a string line.

Adhesive or cement mortar: which is better?

Tile adhesiveCement and sand mortar bed
Bed thicknessThin, 3 to 10 mmThick, 20 to 40 mm
Base neededFlat screedCan correct small unevenness
BondStrong, consistentGood if mixed and compacted well
Hollow tilesRare if spread correctlyCommon if laid with dabs
CostHigher material costCheaper materials, more labour

Many fundis in Tanzania still lay tiles on dabs of cement mortar. It is fast but leaves voids under the tile, which is why tiles later sound hollow and crack at the corners. Full-bed mortar or adhesive avoids this.

Step 4: Cut and fit edge tiles

Measure each edge tile separately, because walls are rarely straight. Leave a 5 to 8 mm gap at walls, columns and door frames for movement. Skirting tiles will cover it.

Step 5: Grout and clean

  1. Wait at least 24 hours after laying.
  2. Remove spacers and clean out the joints.
  3. Press grout into the joints diagonally with a rubber float.
  4. Wipe off excess with a damp sponge before it hardens.
  5. Polish off the haze the next day.
  6. Keep heavy traffic off for 2 to 3 days.

What are the most common tiling mistakes?

MistakeResult
Dabs of mortar instead of full beddingHollow sound, cracked corners
Tiling on a dusty or weak screedTiles come loose
No movement joints in large areasTiles lift and crack in heat
Joints too thin for the tile sizeEdges chip when tiles expand
Grouting too soonTiles shift, grout cracks
Wrong adhesive for large or porcelain tilesPoor bond

How do I check a tiler's work?

Walk the floor and tap tiles with a coin or the handle of a screwdriver. A dull, hollow sound means poor bedding. Check level with a straight edge, look along joints to see they are straight, and check that cut tiles at the edges are neat and even. Ask for any hollow tiles to be lifted and relaid before final payment. See snagging checklist.

Frequently asked questions

Why do my tiles sound hollow?

Usually because they were laid on dabs of mortar with voids underneath, or the adhesive was not spread fully.

How much does tiling cost per square metre in Tanzania?

Labour is often TSh 8,000 to 15,000 per m², plus tiles and adhesive. Large-format and patterned layouts cost more.

Can I tile over old tiles?

Sometimes, if the old tiles are firmly bonded and level, using a suitable adhesive. Check door heights first.

How long before I can walk on new tiles?

Light walking after 24 hours, normal use after 2 to 3 days.

What size spacers should I use?

Usually 2 to 3 mm for rectified porcelain tiles and 3 to 5 mm for ordinary ceramic tiles. Outdoor tiles often need wider joints.

Want tiling done to a high standard?

Vika Construction handles finishes for houses, offices and banks. Contact us to talk about your project.

Found this useful? Share it with someone who is building.

Planning a building project?

Tell us where the site is and what you want built.