Opening hoursMon to Sat, 8am to 5pm
Head officeDar es Salaam, Tanzania

Floor Screed Explained: Mix, Thickness, Levels and Why Screeds Crack

The screed decides whether your tiles or floor finish sit flat. The right mix, thickness and curing, and why so many screeds crack or come loose.

A worker smoothing a new cement screed with a float inside a brick room in Tanzania.
Tanzania Photo: Mtari05 / Wikimedia Commons, CC BY-SA 4.0
Share

A floor screed is a layer of sand and cement, usually about 1:3 to 1:4 by volume, laid over the concrete slab to give a flat, level surface for tiles, terrazzo or other finishes. In Tanzanian houses a screed is typically 25 to 50 mm thick when bonded to the slab, and 50 to 75 mm when laid over a membrane or insulation. It must be mixed fairly dry, compacted well, finished flat, and kept damp for at least 7 days. Most screed failures, such as cracks, hollow patches and dusty surfaces, come from too much water, poor bonding to a dirty slab, layers that are too thin or too thick, and drying too fast in the sun.

Why do floors need a screed?

Slabs are rarely perfectly flat. A screed:

  • creates a flat, level surface for the final floor,
  • sets the right falls in bathrooms, balconies and kitchens so water drains,
  • covers pipes and conduits laid on the slab,
  • brings floors to the correct finished level at doors.

What mix and thickness should a screed be?

Screed typeTypical thicknessMix (cement:sand)Notes
Bonded to slab25 to 40 mm1:3 to 1:4Slab must be clean, rough and primed with slurry
Unbonded (on membrane)50 mm minimum1:3 to 1:4Thicker because it does not stick to the slab
Floating (on insulation)65 to 75 mm1:3 to 1:4May need mesh
Falls in wet areas25 mm at drain to 50 mm or more1:3Typical fall 1 in 80 to 1 in 100 towards the drain

Use clean, well-graded sharp sand, not plaster sand or silty sand. A little coarse grit helps strength. See choosing sand and aggregate.

How do I lay a screed step by step?

  1. Clean the slab. Remove dust, mortar lumps, oil and paint. Wet it the day before so it does not suck water out of the screed.
  2. Set levels. Mark the finished floor level on the walls with a laser or water level. Set screed rails or "dots" of mortar at the right height every 1.5 to 2 m.
  3. Apply bonding slurry. For bonded screeds, brush a cement slurry (sometimes with a bonding agent) onto the damp slab just before laying.
  4. Mix semi-dry. The mix should hold together when squeezed in the hand without water running out.
  5. Lay and compact. Spread the screed between the rails, compact it hard with a tamper or float, and rule it off with a straight edge.
  6. Finish. Wood float for tile adhesive or a steel trowel for direct finishes.
  7. Cure. Cover with plastic or wet sacking and keep damp for at least 7 days.

Why do screeds crack or sound hollow?

ProblemUsual causePrevention
Hollow sound when tappedPoor bond to slabClean, damp slab plus bonding slurry
Fine shrinkage cracksToo much water, fast dryingSemi-dry mix, cure under plastic
Dusty, weak surfaceWeak mix or overworking with waterCorrect mix, do not sprinkle water to finish
Cracks over pipesScreed too thin over servicesKeep at least 25 mm cover or use mesh
Curling at edgesUneven dryingCure evenly, avoid strong sun and wind

How long before I can tile on a screed?

As a rough guide, about one day per millimetre of thickness for full drying, though tiling with cement-based adhesive is often possible after 7 to 14 days for thin bonded screeds. Thick screeds and moisture-sensitive finishes like wood or vinyl need longer and a moisture test. See how to lay floor tiles.

How much does screeding cost?

Labour for screeding in Tanzania is often charged per square metre, roughly TSh 3,000 to 6,000 per m² depending on thickness and falls, plus cement and sand. A 40 mm screed at 1:4 uses about 0.3 bags of cement per m². See building materials prices.

How do I set falls in bathrooms and balconies?

Wet areas need the screed to slope towards the drain so water does not pond against walls.

  1. Mark the drain position and its finished level.
  2. Mark the level at the walls, higher than at the drain by about 1 cm for every 80 to 100 cm of distance.
  3. Set mortar dots at those levels around the room and at the drain.
  4. Screed between the dots, checking with a straight edge and a level.
  5. Test the fall by pouring water before tiling.

On balconies, fall the screed away from the door and towards an outlet or edge, and add a waterproof membrane. See bathroom waterproofing.

What about screeds over underfloor pipes?

Pipes and conduits on the slab should be fixed down and covered by at least 25 mm of screed, with a strip of mesh over them in thin screeds to stop cracks forming along the pipe line. Avoid crossing pipes, which push the screed up and make it too thin at the crossing. Planning service routes before the screed saves a lot of cutting later.

Frequently asked questions

What is the best screed mix?

1:3 to 1:4 cement to sharp sand, mixed semi-dry.

How thick should a floor screed be?

25 to 40 mm when bonded to the slab, at least 50 mm when unbonded.

Can I skip the screed and tile directly on the slab?

Only if the slab was finished flat and level by power floating. Most hand-finished slabs need a screed.

Why is my new screed dusty?

Usually a weak mix, too much water, or sprinkling cement on the surface.

Want floors done right from the slab up?

Vika Construction delivers houses and commercial floors with proper levels and finishes. Contact us to talk about your project.

Found this useful? Share it with someone who is building.

Planning a building project?

Tell us where the site is and what you want built.