Electrical Materials for a New House in Tanzania: Cables, Breakers, Sockets and a Shopping List

Which cable sizes, how many breakers, what earth system and how many sockets. A practical shopping list for wiring a new house safely.

Close-up of green electrical boxes and wiring in a wall setup.
Photo: Pavel Danilyuk / Pexels
Share

A new house in Tanzania needs 1.5 mm² cable for lighting circuits, 2.5 mm² cable for socket circuits, 4 to 6 mm² cable for water heaters and cookers, a distribution board with miniature circuit breakers (MCBs) for each circuit, an RCD (residual current device) for shock protection, a proper earth rod and earth cable, PVC conduits and boxes, and good-quality switches and sockets with the TBS mark. The wiring must be installed and tested by an electrician licensed by EWURA before TANESCO connects power. For a typical 3-bedroom house, materials commonly cost about TSh 2.5 to 6 million, and labour and testing add more. Buying cheap, thin or fake cable is the most common and most dangerous mistake.

Costs are indicative for 2026 and vary with house size, the number of points and the brands you choose.

Cable sizes and what they are for

Cable sizeUsed forTypical breaker
1.5 mm²Lighting circuits6 A or 10 A
2.5 mm²Socket circuits16 A or 20 A
4 mm²Water heater, small cooker20 A to 25 A
6 mm²Electric cooker, large AC32 A
10 mm² to 16 mm²Main supply from meter to boardMain switch or isolator
Green and yellow earth cableEarthing of every circuit and the earth rodNot applicable

Sizes depend on circuit length and load, so your electrician or electrical engineer should confirm them. Never use thinner cable to save money. It overheats and can start fires.

The distribution board and protection

  • Distribution board (consumer unit): the box where all circuits start. Choose one with spare ways for future circuits.
  • Main switch to cut all power.
  • MCBs (miniature circuit breakers) for each circuit, sized to the cable.
  • RCD or RCBO (30 mA): cuts power quickly if current leaks to earth, for example through a person. This saves lives, especially in bathrooms, kitchens and outdoor sockets.
  • Surge protection device: protects electronics from spikes and lightning surges. Strongly recommended in Tanzania.
Electrical meter and fuse box on a white wall in Cape Town, South Africa, for energy monitoring or billing.
Every circuit should have its own breaker, with an RCD protecting people from shocks. Photo: Akashni Weimers / Pexels

Earthing: do not skip it

Every house needs an earth system:

  • An earth rod (copper-bonded) driven into the ground, usually near the meter.
  • An earth cable from the rod to the distribution board.
  • Earth wires to every socket, light fitting and metal appliance.
  • Testing of the earth resistance by the electrician.

Good earthing protects people and makes the RCD work properly. Our guide on lightning protection and earthing explains it in more depth.

Conduits, boxes and accessories

  • PVC conduits (usually 20 mm and 25 mm) built into walls and slabs before plastering.
  • Bends, couplers and junction boxes.
  • Switch and socket boxes set level in the walls.
  • Cable ties, clips and labels.

Lay conduits before plastering and before casting slabs. Cutting walls later is messy and weakens them. See plastering walls.

Switches, sockets and lights

Tanzania uses 230 V and the three-pin square socket (the British-style Type G plug), though many appliances come with other plugs. Buy:

  • Switches and sockets with the TBS mark, from reputable brands.
  • Double sockets in living rooms, kitchens and bedrooms.
  • Weatherproof sockets for outdoor use.
  • A dedicated socket for the fridge.
  • Shaver or protected sockets in bathrooms only if allowed by the design.
  • LED lights throughout, to cut power bills.

Shopping list for a typical 3-bedroom house

Example only, single storey, about 120 m²:

ItemQuantity (estimate)
1.5 mm² cable (lighting)2 to 3 rolls of 100 m
2.5 mm² cable (sockets)3 to 4 rolls of 100 m
4 or 6 mm² cable (heater, cooker)20 to 40 m
Earth cable1 to 2 rolls
Main supply cable (10 or 16 mm²)Meter to board length
PVC conduit 20 mm60 to 100 lengths
Switch boxes and socket boxes40 to 60
Switches15 to 25
Sockets (mostly double)20 to 30
Light fittings15 to 25
Distribution board (8 to 12 ways)1
MCBs8 to 12
RCD 30 mA1 or 2
Surge protector1
Earth rod and clamp1 set

Example cost of materials: about TSh 2.5 to 6 million, depending on brands and the number of points. Labour and testing usually add TSh 1 to 3 million for a house this size.

Close-up view of a complex tangle of electrical wires outdoors.
Messy, unlabelled wiring is hard to repair and dangerous. Insist on neat, labelled circuits. Photo: Markus Winkler / Pexels

How to spot fake or poor-quality electrical materials

  • Cable that feels light and thin. Check the copper thickness and the printed size on the sheath.
  • Prices far below the market. Real copper costs money.
  • No brand, no TBS mark, no batch details.
  • Sockets with weak springs that let plugs fall out.
  • Breakers that feel very light or have blurred printing.

Buy from known dealers, keep receipts, and ask your electrician to check materials before they go into the walls.

Licences, testing and TANESCO connection

Plan for the future

  • Add spare ways in the distribution board.
  • Put sockets where you will have TVs, internet routers and chargers.
  • Plan a separate circuit for a solar inverter or generator changeover. See solar for a new house.
  • Add outside lights and sockets for security and gardening.

Common wiring mistakes to avoid

  1. Too many sockets on one circuit, especially in kitchens where kettles, microwaves and fridges run together.
  2. No RCD, which leaves people unprotected from shocks.
  3. Joints buried in walls instead of in accessible junction boxes.
  4. Mixing up colours, so the next electrician cannot tell live, neutral and earth apart.
  5. Weak earthing, or no earth rod at all.
  6. Water heater on a socket circuit instead of its own circuit and isolator.
  7. No labels on the distribution board, which makes repairs slow and risky.
  8. Outdoor sockets and lights without weatherproof covers.

Fixing these after plastering means cutting walls. Check the conduit layout and board before the walls are closed. Our guide on quality control explains how to check hidden work with photos.

Saving power from day one

  • LED bulbs everywhere.
  • Light-coloured walls and good windows, so you need fewer lights by day.
  • A solar water heater instead of an electric geyser. See solar for a new house.
  • Ceiling fans before air conditioners.

Frequently asked questions

What size cable is used for sockets in Tanzania?

Usually 2.5 mm² copper cable on a 16 A or 20 A breaker, but the electrician should confirm for each circuit.

How much does it cost to wire a 3-bedroom house in Tanzania?

Materials often cost TSh 2.5 to 6 million, with labour and testing about TSh 1 to 3 million more, depending on size and quality.

Do I need an RCD in my house?

Yes. A 30 mA RCD protects people from electric shocks and is strongly recommended for every house.

Who can wire a house in Tanzania?

An electrician or electrical contractor licensed by EWURA. TANESCO requires a test certificate before connection.

Can I buy electrical materials myself and give them to the electrician?

Yes, but agree the list with the electrician first, buy from reputable dealers, and let the electrician check everything before installation.

Building or rewiring a house?

Vika Construction delivers buildings with safe, tested electrical installations through licensed specialists. Contact us to discuss your project.

Found this useful? Share it with someone who is building.

Planning a building project?

Tell us where the site is and what you want built.