Dar es Salaam to Chalinze to Morogoro Expressway: Toll Road, Route and Land Impact

Tanzania's first toll expressway is planned on its busiest road. How it would work, why it is a PPP, what has been built so far and what it means for land in Pwani and Morogoro.

A green TANROADS road sign giving distances to Chalinze, Kibaha, Dar es Salaam and Morogoro.
Pwani Region Photo: Praygod mwanga / Wikimedia Commons, CC0
Share

The Dar es Salaam to Chalinze to Morogoro expressway is a planned high-capacity toll road on Tanzania's busiest corridor. The first part, the widening of Morogoro Road from Kimara to Kibaha to eight lanes (about 19 km), has already been built. The next part, an expressway from Kibaha to Chalinze and on to Morogoro (roughly 200 km), is being developed as a public private partnership (PPP), where a private investor builds and runs the road and recovers the cost through tolls over a long concession. Once built, it would cut travel times, carry heavy trucks heading inland and to neighbouring countries, and change land use along the route. Land near the planned interchanges is the most likely to gain value.

What is an expressway and how is it different from a normal road?

An expressway is a divided, high-speed road with limited access. Vehicles enter and leave only at interchanges, not from every plot or side road.

FeatureNormal trunk roadExpressway
AccessDirect from plots and side roadsOnly at interchanges
Lanes2 to 44 to 8, divided
Speed50 to 80 km/h typical100 to 120 km/h design
CrossingsAt levelBridges and underpasses
PaymentFreeUsually tolled
TrafficMixed, including bicycles and livestockMotor vehicles only

This matters for land: a plot beside an expressway with no interchange nearby gets little benefit and may lose direct access.

Why does this corridor need an expressway?

The Dar to Morogoro road carries traffic heading to Dodoma, the southern highlands, Zambia, Malawi, the lake zone and DR Congo. Trucks from Dar port share the road with buses and cars. Accidents, slow climbs, towns along the road and frequent stops mean long, unpredictable journeys. An expressway would separate long-distance traffic from local traffic.

The SGR railway will take some freight off the road, but road traffic keeps growing. See our SGR guide.

Trucks and traffic at the road junction in Morogoro where the Dar es Salaam, Dodoma and Iringa roads meet.
Morogoro, at the far end of the planned expressway, where the roads to Dodoma and Iringa split. Morogoro Photo: Xiaotong Gao / Wikimedia Commons, CC BY-SA 3.0

What has been built so far?

The Kimara to Kibaha section was widened to eight lanes with service roads, completed in the early 2020s. Weigh bridges, bridges and junction upgrades followed. The Kibaha to Chalinze expressway section is the first PPP target. Tanzania's PPP Centre and TANROADS have run the process to select an investor. Progress on PPP roads is often slow because financing and toll levels must be agreed before construction starts.

How would the toll model work?

Under a PPP, the private partner usually:

  1. designs and builds the road
  2. raises most of the money from lenders and shareholders
  3. operates and maintains it for 25 to 30 years
  4. collects tolls, sometimes with a minimum revenue guarantee from government
  5. hands the road back at the end

Toll rates would be set in the agreement and adjusted over time. The free Morogoro road would remain as an alternative for those who do not want to pay.

How will the expressway affect land along the route?

Interchanges

Land within a few kilometres of planned interchanges near Kibaha, Mlandizi, Chalinze, Ngerengere and Morogoro is likely to gain the most. Logistics parks, fuel stations, truck stops, hotels and warehouses cluster at interchanges.

Land in the corridor

Land needed for the road reserve will be acquired, with compensation based on valuation. Do not buy land without checking the corridor.

Towns along the old road

Some towns may lose passing trade when through traffic moves to the expressway. Others will gain from easier access.

What opportunities does it bring for builders?

  • Logistics parks and warehouses near Kibaha, Mlandizi and Chalinze. See warehouse construction.
  • Roadside services: fuel stations, workshops, restaurants and truck stops at interchanges.
  • Housing in Kibaha and Chalinze for people who work in Dar but want cheaper land.
  • Hotels at Chalinze and Morogoro for travellers and drivers.
  • Civil works for contractors: drainage, access roads and junction works.

What are the main concerns?

  • Tolls. Some drivers may avoid the expressway, which affects revenue.
  • Cost and debt. PPP contracts can include guarantees that put risk on government.
  • Delays. PPP roads take years to negotiate.
  • Communities split by the road. Pedestrian crossings and underpasses must be planned well.
The Chalinze District Council offices in Bwilingu ward, Chalinze.
Chalinze, where the expressway will meet the roads to Morogoro and the north. Chalinze Photo: Mnazini / Wikimedia Commons, CC BY-SA 4.0

How will the expressway change daily life in Kibaha and Chalinze?

For people living along the corridor, the change will be uneven. Long-distance trucks and buses will move faster and spend less time in town centres, which should mean fewer accidents and less noise on the old road. Commuters from Kibaha to Dar may save time if they are willing to pay the toll. Shops and guest houses that depend on passing trucks may see less trade unless they are close to an interchange.

Land use will also shift. Councils are likely to plan logistics zones, fuel stations and commercial strips near interchanges, with housing set further back. If you own land in the area, it is worth asking the district planning office what land use is proposed near you, and whether access roads to the expressway interchanges are planned. That one question can change whether your plot is best for a warehouse, shops or homes.

Frequently asked questions

Is the Dar to Chalinze expressway built?

The Kimara to Kibaha eight-lane section is built. The Kibaha to Chalinze to Morogoro expressway is being developed as a PPP and was not yet complete as of late 2026.

Will Tanzania have toll roads?

Yes, the expressway is planned as Tanzania's first major toll road. The free old road would stay open as an alternative.

What is a PPP road?

A road built and run by a private company under a long contract with government, paid back through tolls or government payments.

Where should I buy land near the expressway?

Near planned interchanges, outside the road reserve, with clear title and good local road access. Ask TANROADS for the alignment.

Have land along the Morogoro corridor?

Vika Construction builds warehouses, commercial buildings, access roads and drainage. Contact us to discuss your plans.

Found this useful? Share it with someone who is building.