In a typical single-storey house in Tanzania, reinforced concrete columns are about 230 by 230 mm with four 12 mm bars and 8 mm links (stirrups) every 150 to 200 mm, using 1:1.5:3 concrete. For a two-storey house, ground floor columns are often 230 by 300 mm or larger with four to six 12 to 16 mm bars, but the engineer must size them from the actual loads. Columns go at corners, wall junctions and on each side of wide openings, usually no more than about 3 to 4 metres apart. The details that matter most are close link spacing near the top and bottom, enough concrete cover, proper laps, and well-compacted concrete with no honeycombing.
What do columns do in a house?
Columns carry loads from the roof, slabs and beams straight down to the foundation. In a framed building they do most of the structural work, and the block walls are mostly infill. In a load-bearing wall house, columns at corners and junctions stiffen the walls and tie them to the ring beam. Either way, a weak column is a serious problem. See how buildings carry loads.
What size and steel should a column have?
| Building | Typical column | Main bars | Links |
|---|---|---|---|
| Single-storey house, block walls | 230 × 230 mm | 4 × Y12 | Y8 at 150 to 200 mm |
| Two-storey house, ground floor | 230 × 300 mm or 300 × 300 mm | 4 to 6 × Y12 or Y16 | Y8 at 150 mm |
| Three storeys and above | Engineer's design | Engineer's design | Closer near joints |
These are common starting points. Your structural engineer must design columns for your building's actual loads, spans and soil.
Some rules apply to all columns:
- Minimum four bars, one in each corner.
- Links closer near the ends, often 100 mm for the top and bottom 450 to 600 mm, where forces are highest and earthquakes do the most damage.
- Hooks on links bent to 135 degrees in earthquake areas, so they do not open up.
- Cover of 25 to 40 mm to the links, more on outside faces and near the coast.

Where should columns go?
- At all external corners.
- Where walls meet (T and L junctions).
- On both sides of wide doors and windows.
- Under beam supports and heavy loads, like water tank stands.
- At regular spacing along long walls, often every 3 to 4 metres.
How do I make sure columns are built right?
- Check the steel before closing the formwork. Count the bars, measure link spacing, check laps and spacers.
- Start bars from the foundation. Column starter bars should be cast into the footing or ground beam, not drilled in later.
- Lap bars at least 40 to 50 bar diameters, or as the engineer says, and not all at the same height.
- Pour in layers of about 300 to 500 mm and vibrate each layer.
- Avoid dropping concrete from too high. In tall columns, use a chute or pour through a window in the formwork.
- Check for honeycombing after stripping. Small spots can be repaired; large voids need the engineer.
- Cure with water or wet sacking for at least 7 days.
See steel reinforcement bars and mixing concrete on site.
What are the most dangerous column shortcuts?
- Using 10 mm bars instead of 12 mm to save money.
- Links spaced 300 mm or more apart.
- Columns cast with too much water and no vibration.
- Bars cut short and joined without proper laps.
- Thin cover, so the steel rusts within a few years.
- Adding floors to a house whose columns were sized for one storey.
The last one is common in Tanzanian cities. If you plan to build up later, design the columns and foundations for the final number of floors from the start. See building a storey house and extending a house.
How do columns connect to the foundation and the roof?
A column is only as good as its connections at both ends.
- At the bottom, column starter bars should be bent into the footing or tied into the ground beam steel before the footing is cast. The column then has a continuous load path into the ground.
- At the top, column bars should run up into the ring beam or roof beam and bend into it, so the column, beam and walls act as one frame.
- At each floor, column bars continue through the slab or beam, with laps just above the floor level, where the engineer specifies.
Missing these connections is a common shortcut on small sites, and it leaves columns that can shift or crack at the joints.
How do I check existing columns in an old house?
Signs of problems include rust stains, cracks running along the column, concrete falling off and exposing steel, or columns that are visibly out of plumb. Spalling from rust is common near the coast. A structural engineer can assess the column and recommend repair by removing damaged concrete, treating or replacing steel and recasting, or by jacketing the column with new concrete and steel. See signs a building needs a structural inspection.
Frequently asked questions
What is the minimum column size for a house?
230 by 230 mm is the common minimum for single-storey houses with block walls.
How many bars should a column have?
At least four, one in each corner. Larger columns may need six or eight.
Can I add a second floor on existing columns?
Only if an engineer confirms the columns and foundation can carry it. Many cannot.
What concrete grade is used for columns?
Usually C25 (about 1:1.5:3) or higher.
Need a structural check?