
The JP Magufuli Bridge, also called the Kigongo to Busisi Bridge, is a 3 km road bridge across the Mwanza Gulf of Lake Victoria in Mwanza region. It is the longest bridge in East Africa. It replaced a ferry crossing that could take an hour or more including the wait, and cut the crossing to a few minutes by car. The bridge was built by Chinese contractors CCECC and China Railway 15th Bureau Group for about TSh 716 billion (roughly USD 300 million), funded by the Tanzanian government. Construction started in 2020 and the bridge opened in 2025. It links Mwanza city with Sengerema, Geita, Kagera and the western lake zone.
What are the key facts about the bridge?
| Feature | Figure (approx.) |
|---|---|
| Total length | about 3.0 km (3.2 km with approaches) |
| Type | Extradosed / cable-stayed main spans with long approach viaducts |
| Width | about 28 m with 2 lanes each way and walkways |
| Main span | about 160 m |
| Cost | about TSh 716 billion |
| Contractors | CCECC and China Railway 15th Bureau |
| Client | TANROADS |
| Construction | 2020 to 2025 |
Why was the bridge needed?
The Mwanza Gulf cuts deep into the land west of Mwanza city. Traffic heading west towards Sengerema, Geita, Chato and Kagera had two choices: a long road detour, or the Kigongo to Busisi ferry. The ferry was slow, ran to a timetable, stopped at night and was often full. Trucks queued for hours. Breakdowns stranded travellers.
A fixed link was discussed for decades. The government approved it in 2019, and the contract was signed in 2020.

How was a 3 km bridge built across Lake Victoria?
Foundations in the lake
The bridge stands on bored piles driven through water and soft lake sediment into firm ground or rock below. Workers used floating platforms and steel casings to drill each pile, then filled it with reinforced concrete. Pile depths vary along the bridge depending on how deep the firm layer is.
Piers and pile caps
Pile caps tie groups of piles together at water level. Concrete piers rise from the caps to carry the deck. The tallest piers support the main navigation spans so lake vessels can still pass underneath.
The deck
The approach spans use precast or cast-in-place concrete segments. The main spans in the middle are supported by cables from towers (an extradosed or cable-stayed design). This lets the bridge span a wider gap in the navigation channel without extra piers in the water.
Working with the lake
The lake brings its own problems: wind and waves on floating equipment, changing water levels, soft lakebed and the need to protect water quality. The contractors used marine barges, floating cranes and temporary trestles.
For a basic primer on how structures carry loads, see how columns, beams and slabs work.
What changed after the bridge opened?
- Travel time. The crossing now takes a few minutes instead of an hour or more including queues.
- Trade. Trucks carrying fish, cotton, gold-region supplies, cement and fuel move west without waiting.
- Night travel. The ferry stopped at night; the bridge never closes.
- Tourism. Routes to Rubondo Island and the western lake zone are simpler.
- Regional links. It shortens road trips from Mwanza towards Kagera and on to Uganda and Rwanda.
What does the bridge mean for land and property?
Kigongo on the Mwanza side and Busisi on the Sengerema side were small ferry towns. With the bridge, they are turning into through-towns. We expect, and are already seeing:
- higher land prices on both approaches, especially close to junctions
- demand for fuel stations, roadside shops, guest houses and restaurants
- warehousing for goods moving into Geita and Kagera
- commuter housing in Sengerema district for people working in Mwanza city
Who was Magufuli and why is the bridge named after him?
John Pombe Joseph Magufuli was Tanzania's president from 2015 until his death in 2021. He came from Chato in Geita region, on the far side of the gulf, and pushed for the bridge as part of a wider programme of big infrastructure. Before becoming president, he served as Minister of Works. The bridge was named after him in his honour.
What did the bridge cost and was it worth it?
At around TSh 716 billion, the bridge is one of the most expensive single road structures in the country. Supporters say the time saved, the trade enabled and the safety gains justify it, and that fixed links pay back over 50 to 100 years. Critics argue a cheaper upgraded ferry system could have served for longer. Our view as builders: a bridge designed for a 100 year life, serving one of the fastest growing regions in Tanzania, is a reasonable long-term bet.

Frequently asked questions
How long is the JP Magufuli Bridge?
About 3 km, or about 3.2 km including approaches. It is the longest bridge in East Africa.
When did the Kigongo to Busisi bridge open?
It opened to traffic in 2025 after about five years of construction.
Is there a toll on the JP Magufuli Bridge?
Check with TANROADS for current arrangements. Most Tanzanian bridges are toll free, but some major crossings have toll systems.
Who built the Kigongo to Busisi bridge?
China Civil Engineering Construction Corporation (CCECC) and China Railway 15th Bureau Group, under contract to TANROADS.
What is the longest bridge in Tanzania before this?
The Kigamboni (Nyerere) Bridge in Dar es Salaam (680 m) and the Tanzanite Bridge (Selander) were well known, but both are much shorter.
Building in Mwanza or the lake zone?
Vika Construction works on buildings and civil works across Tanzania, including the lake zone. If you have land near Kigongo, Busisi or along the western roads, contact us to plan your project.
Found this useful? Share it with someone who is building.


