A general contractor (often called the main contractor) takes responsibility for building the whole project and manages all the trades and subcontractors under one contract. A specialist contractor does one part of the work, such as electrical installation, plumbing, aluminium and glazing, lifts, air conditioning, fire systems, waterproofing or piling. Most projects in Tanzania need both: one general contractor in overall control, with specialists working under them or alongside them. Hiring specialists directly can save money on small, simple jobs, but on larger buildings it pushes the coordination risk back onto you, and the gaps between trades are where delays and disputes start.
So the useful question to ask is who coordinates the specialists, and who carries the risk when they clash.
What does a general contractor do?
The general contractor signs one contract with the client for the whole building, then:
- builds the main structure with its own workforce
- hires, schedules and supervises subcontractors
- coordinates trades so they work in the right order
- manages the site, safety, security and welfare
- controls quality across all trades
- carries the responsibility if a subcontractor fails
- deals with the client and design team as one point of contact
The client pays the general contractor, and the general contractor pays the subcontractors. If the electrician is late, the main contractor has to sort it out.
What does a specialist contractor do?
A specialist contractor focuses on one trade or system that needs specific skills, licences or equipment. Common specialists in Tanzania include:
| Specialist | Work | Licence or registration |
|---|---|---|
| Electrical | Wiring, boards, lighting, earthing | EWURA electrical installation licence, CRB electrical category |
| Mechanical | Air conditioning, ventilation, pumps | CRB mechanical category |
| Plumbing and drainage | Pipes, tanks, sanitary fittings | Usually under building or specialist registration |
| Fire protection | Alarms, sprinklers, hydrants | Fire and Rescue Force approval of designs |
| Lifts | Supply, installation, maintenance | Manufacturer certification |
| Aluminium and glazing | Windows, curtain walls, partitions | CRB specialist registration |
| Waterproofing | Membranes, basements, roofs | Manufacturer approval |
| Piling and ground works | Deep foundations | CRB civil works |
| Solar and generators | Backup power | EWURA where relevant |
Our guide to starting an electrical installation business explains the EWURA licence classes, which also tell a client what size of job an electrician may legally do.

The three ways to bring specialists into a project
1. Domestic subcontractors
The general contractor chooses, hires and pays the specialist. The client only deals with the main contractor. This is the simplest arrangement and gives the client one point of responsibility.
2. Nominated subcontractors
The client or design team chooses the specialist, often because of a particular brand or quality, and instructs the general contractor to employ them. The main contractor coordinates and pays them, but responsibility for their performance can be shared, depending on the contract. Lifts and fire systems are often handled this way.
3. Direct contracts
The client signs separate contracts with each specialist. This can save the main contractor's margin, but the client becomes the coordinator. When the plasterer is waiting for the electrician, who is waiting for the aluminium fixer, it is the client's phone that rings.
When does a general contractor make sense?
- the building has many trades that must work in sequence
- you do not have your own project manager or the time to manage the site
- the project is commercial, institutional or multi-storey
- the lender or board wants one responsible contractor
- the programme is tight
Banks, schools, hospitals, offices and apartment developers almost always use a general contractor.
When does hiring specialists directly make sense?
- the work is mainly one trade, such as rewiring an office or replacing windows
- you have an experienced project manager on your side
- the job is small and the specialists do not depend much on each other
- you are an organisation with in-house facilities staff
Even then, write clear contracts with each specialist and decide in advance who coordinates.
Cost comparison: does a general contractor cost more?
The general contractor adds a margin for managing subcontractors, often 5 to 15% on the subcontracted work, plus preliminaries for running the site. On paper, direct contracts look cheaper. In practice the savings can disappear through:
- delays when trades are out of sequence
- damage one trade does to another's work, with nobody responsible
- gaps in scope, such as who makes good the wall after the plumber cuts it
- your own time and the cost of hiring a manager
- claims from specialists who were kept waiting
| Factor | General contractor | Direct specialist contracts |
|---|---|---|
| Upfront price | Higher margin | Lower on paper |
| Coordination | Contractor's job | Your job |
| Single responsibility | Yes | No |
| Risk of gaps between trades | Low | High |
| Suits | Most buildings | Small single-trade jobs |

Example: a three-storey office building
Picture a three-storey office of about 1,500 m² in Dodoma. Apart from the main structure, it needs electrical installation, data cabling, air conditioning, plumbing, a fire alarm, aluminium windows and a glazed entrance, gypsum ceilings, a lift and a generator. That is at least eight specialist packages.
Under a general contractor, the main contractor builds the frame and walls and brings in each specialist at the right time: conduits and sleeves are cast into slabs before the concrete pour, aluminium openings are measured after the blockwork is up, ceilings close only after electrical, data and air conditioning are tested. One programme links every trade, and the client attends a weekly or fortnightly meeting to approve and decide.
Under direct contracts, the client's own team must do that sequencing. Miss one step, such as forgetting to cast the sleeves for the air conditioning pipes, and the slab gets cored later, at a cost, with a structural engineer's approval. Multiply that by eight packages and the saved margin goes quickly.
How payments flow under each arrangement
Under a general contractor, you make one monthly payment to the main contractor based on a valuation of work done, minus retention. The main contractor then pays its subcontractors. Under direct contracts you make several payments each month, each with its own valuation, retention and paperwork. That is more work for your finance team and more chances for a specialist to stop work because a payment was late.
Some clients pay key specialists through the main contractor but ask for proof that subcontractors have been paid, to protect against a main contractor holding back money from the trades.
How to manage specialists under a general contractor
Even with a main contractor, the client has a role:
- Specify clearly. Brands, standards and performance should be in the specification, not left to the cheapest option.
- Approve key specialists. Ask to see who the main contractor will use for electrical, fire and lifts.
- Check licences. EWURA for electricians, fire design approvals, and manufacturer certification for lifts.
- Require testing and certificates. Insulation tests, pressure tests, fire system commissioning.
- Collect warranties. Each specialist system should come with its own warranty, passed to you at handover.
See quality control in construction and construction handover documents.
What about design and build?
In design and build, the general contractor also provides the design, often using specialist designers for structure and services. This puts even more responsibility in one place, which many clients like on commercial projects.
Common mistakes clients make
- Hiring an aluminium fixer before the openings are built, so frames do not fit.
- Letting the electrician and plumber chase walls after plastering.
- Buying air conditioning units without a mechanical engineer sizing them.
- Signing direct contracts with no programme linking the trades.
- Forgetting fire systems until the inspection fails.
Frequently asked questions
What is a main contractor?
Another name for the general contractor: the company with the main contract for the whole building, responsible for all the work, including subcontractors.
Can a general contractor do electrical work itself?
Only if it holds the right EWURA electrical licence and CRB registration. Most use licensed electrical subcontractors.
Is a nominated subcontractor the client's responsibility?
Partly, depending on the contract. Read the clauses on nominated subcontractors carefully, because some contracts limit the main contractor's liability for them.
Should I buy materials myself to save money?
Client-supplied materials can save the contractor's markup, but you take on delivery timing, quality and storage risks. Delays in your supply become delays you pay for.
Who is responsible if a specialist's work damages the building?
Under a general contractor, the main contractor is responsible to you and recovers from the subcontractor. Under direct contracts, you deal with the specialist yourself.
What is a trade contractor?
Another name for a specialist contractor who does one trade, such as tiling, painting, roofing or plumbing. On large projects these firms usually work as subcontractors to the main contractor.
Can I change a specialist chosen by the main contractor?
You can ask to approve key specialists before they start. Once a subcontract is signed, changing it can cost time and money, so raise concerns early, ideally at the tender or start-up stage.
Want one contractor to handle everything?
Vika Construction works as a general contractor for commercial and institutional buildings, managing specialists under one programme with project management and quality checks. Contact us to discuss your project.