The East African Crude Oil Pipeline (EACOP) is a 1,443 km buried pipeline being built to carry crude oil from oil fields near Lake Albert in Uganda to a storage and loading terminal at Chongoleani near Tanga on the Tanzanian coast. About 1,147 km of it runs through Tanzania, across eight regions: Kagera, Geita, Shinyanga, Tabora, Singida, Dodoma, Manyara and Tanga. Because the oil is waxy, the pipe is heated and insulated, making it the longest heated crude pipeline in the world. It costs about USD 5 billion and is owned by TotalEnergies (about 62%), the Uganda National Oil Company and the Tanzania Petroleum Development Corporation (about 15% each) and CNOOC (about 8%). First oil exports are expected once the Ugandan fields and the pipeline are both ready, around 2026 to 2027.
What does EACOP consist of?
| Part | Details (approx.) |
|---|---|
| Pipeline length | 1,443 km total, about 1,147 km in Tanzania |
| Pipe size | 24 inch diameter, buried about 1.8 m deep |
| Design capacity | about 216,000 barrels per day at peak |
| Heating | Electric heat tracing with insulation |
| Pump stations | Several along the route, some in Tanzania |
| Marine terminal | Storage tanks and jetty at Chongoleani, Tanga |
| Construction camps | Along the route, each housing hundreds of workers |
Why is the pipeline heated?
Ugandan crude is waxy. At normal temperatures it thickens and would clog the pipe. The pipeline is wrapped in insulation and heated by electric cables along its length so the oil stays above about 50 °C and keeps flowing. This adds cost and power demand but avoids building a refinery first.
How is a pipeline like this built?
Pipeline construction moves along the route like a long factory line:
- Surveying and clearing a working strip, usually 30 m wide.
- Stringing pipes along the strip.
- Welding pipes together, with every weld checked by X-ray or ultrasound.
- Coating and insulating the joints.
- Trenching to the required depth.
- Lowering in the pipe string with side-boom tractors.
- Backfilling and restoring the land.
- Pressure testing with water.
River and road crossings use horizontal directional drilling or open cut methods. Many Tanzanian companies supplied services: earthworks, camp construction, catering, transport, security and fencing.

Why is EACOP controversial?
EACOP is one of the most debated projects in Africa. Main concerns raised by campaigners:
- Climate. Opponents argue new oil infrastructure locks in emissions for decades.
- Land and compensation. Thousands of households along the route lost land use. Some complained about valuation and delays in payment.
- Water and wildlife. The route passes near the Lake Victoria basin and crosses wildlife areas and rivers.
- Spills. A leak from a heated, buried pipeline could harm farmland and water.
Supporters, including both governments, argue that Uganda and Tanzania have a right to develop their resources, that the pipeline creates jobs and tax income, and that strict environmental standards apply. Several international banks and insurers declined to fund it, so financing came from a narrower group of lenders.
What does EACOP mean for Tanga?
Tanga was one of East Africa's busiest ports and industrial towns decades ago. EACOP, together with the upgraded Tanga port, new cement and industrial investments and better roads, is bringing it back into view.
- Jobs: construction and later operations at Chongoleani
- Housing demand: workers, managers and contractors need places to stay
- Services: hotels, restaurants, transport, workshops
- Land values: areas around Chongoleani, Pongwe and the Tanga to Horohoro road have seen more interest
See our guide to building near the coast, since salt air affects steel and concrete in Tanga.
What does it mean for towns along the route?
Most of the route is rural. During construction, camps bring short-term business to towns like Nzega, Singida, Kondoa and Handeni. After construction, the pipeline needs few staff. The lasting benefits are improved access roads, some local skills, and payments to communities and local governments. Do not expect a lasting property boom in most route towns.
Will Tanzania earn money from EACOP?
Yes, through TPDC's share in the pipeline company, transit fees per barrel, taxes and local spending. The amounts depend on oil prices and flow. Tanzania does not own the oil itself, which belongs to Uganda's fields.

What did local contractors learn from EACOP?
Big pipeline projects run to international standards on safety, quality and paperwork. Tanzanian firms that worked on camps, access roads, fencing and civil works had to meet those standards to get paid, and many say it changed how they run their own sites.
- Safety systems. Daily toolbox talks, permits to work, full protective equipment and incident reporting became normal.
- Quality records. Every concrete pour, compaction layer and weld needed a test result and a signed record.
- Environmental rules. Topsoil had to be stored and replaced, water crossings protected and waste tracked.
- Local content reporting. Contractors had to show how many Tanzanians they hired and what they bought locally.
These skills carry over to mining, energy, roads and commercial work. For a contractor, a track record on a project like EACOP is a strong reference when tendering for other large clients. See how to win construction tenders.
Frequently asked questions
How long is the EACOP pipeline?
1,443 km in total, with about 1,147 km in Tanzania and the rest in Uganda.
Where does EACOP end?
At the Chongoleani peninsula near Tanga, where oil is stored in tanks and loaded onto ships.
Who owns EACOP?
TotalEnergies holds about 62%, the Uganda National Oil Company about 15%, the Tanzania Petroleum Development Corporation about 15% and CNOOC about 8%.
When will EACOP start operating?
First oil is expected once both the Ugandan oil fields and the pipeline are complete, with targets around 2026 to 2027.
Does EACOP carry Tanzanian oil?
No. It carries Ugandan crude oil. Tanzania earns transit fees, taxes and its share of pipeline profits.